At NORDEN, we understand that each project presents unique challenges. Our experience enables us to adapt to diverse project requirements, consistently delivering results that exceed expectations, regardless of project size or complexity.

01
AECOM – Engineer of Record for ILM Project/BC Hydro
This project was developed in the form of “Design-Build” by Flatiron-Graham, a Joint Venture (FGJV). NORDEN participated on behalf of the Prime Contractor in the design and construction support services relating Professional of Record (POR) to the transmission alignment. This project was completed in 2015 and we are currently participating in the Project Close Out with BC Hydro. ILM Project is approximately 248 km in length, 500 kV single circuit overhead AC transmission line, identified as circuit 5L83.
02
Alberta Solar Perimeter Power Plant – Private Project
This is a green field substation of 130MVA in which NORDEN’s scope included the design of the substation, high voltage facilities, fence with gate, bus bars, control building. This project is to be completed in 2018.


03
Alberta ET Solar Power Plant – Private Project
This is a green field substation of 60MVA in which NORDEN’s scope included the design of the substation, high voltage facilities, fence with gate, bus bars, control building. This project was completed in 2017.
04
MITENG – Lower Churchill Project Tower Family Design Submittals
Our team, on behalf of tower manufacturer MITAS, worked as Engineer of Record and engineering reviewer for the 240kV tower family used in the Lower Churchill Project. This project included the design, review and stamping for fabrication of 3 tower types and associated foundations, bill of materials and PLS-TOWER modeling.


05
ATCO Electric Yukon – Paint Mountain
Our team participated, on behalf of the prime contractor AECOM, in the engineering and construction supervision of a 5kV armored cable of 1.7km which runs on Paint Mountain to interconnect various radio and weather stations for the region. This included counductor design, route selection and civil details of the installation.
06
Nova Scotia Power – Line vegetation Assessment
Our team participated in the PLS-CADD analysis and generation of Vegetation Grow-In Violations for lines L7004, L7019 and L7003 (323km), on behalf of the prime contractor Line Wise.


07
Line Wise – VELCO Line vegetation Assessment
Our team is participating in the PLS-CADD analysis and generation of Vegetation Grow-In Violations.
08
Rokstad, Regional Power – Long Lake Hydro Transmission Line
Our team participated in the Quality management and Field Engineering of the project for the appropriate certifications and documents prior to job completion and commissioning.


09
Claresholm Solar Perimeter Power Plant – Private Project
This is a green field Solar farm project including 130MVAac and a substation in which NORDEN’s scope included the Capacity Factor Certification of the power plant, AUC application and then, IFC of the complete design of the substation, high voltage facilities, fence with gate, bus bars, control building. NORDEN participated in the electrical and civil design of the project. This project was put in service in January 2021.
10
Enterprise Solar Power Plant – Private Project
This is a green field substation of 100MVA 138/34.5kV in which NORDEN’s scope included the design of the substation, high voltage facilities, solar design for 33 inverters ready for BESS system, control building and the communications.


11
Big Sky Solar Power Plant – RES
This is a green field substation of 180MVAdc 144/34.5kV in which NORDEN’s scope included the design of the solar farm design for 38 inverters ready for BESS system, collector system, CAD system, grading and communications.
12
Nova Solar Power Plant – RES
This is a green field substation of 150MVAdc 138/34.5kV in which NORDEN’s scope included the design of the solar farm design for 52 inverters ready for BESS system, collector system, CAD system, grading and communications.


13
Smart Wires – Duke Energy
Smart Wires was engaged to supply three (3) pods which contained the following equipment: 1 SmartValve, 1 SmartBypass, and 1 Bypass Filter ( the “Pods”) at the Winter Springs 138kV Substation (the “Project”). This substation is part of the electrical system of Duke Energy, Florida (the “Utility”).
14
Smart Wires – EPM Colombia
Smart Wires was engaged to supply three (3) pods which contained: 1 SmartValve, 1 SmartBypass, and 1 Bypass Filter ( the “Pods”) at the Envigado 110kV Substation (the “Project”). This substation is part of the electrical system of Empresas Publicas de Medellin (EPM) of Colombia (the “Utility”).


15
TECK – 138kV/13.8kV Fording River Mine Substation Expansion
This is a brown field substation expansion project for the Front-End Engineering Design (FEED) and final design package for the Fording River Mine Substation upgrade. The existing substation requires the addition of a new third transformer and a new 13.8kV switchgear building to provide appropriate capacity to the planned expansion of operations of the Fording River Mine for the next 50 years.